Today, when cars and truck enter the Port of Miami cruise and cargo terminals, many will have passed 120 feet beneath Government Cut – a wide entryway and turning basin for cruise ships and cargo ships to enter the busy port.
The parallel 4,200-foot long, 29-foot wide tunnels start on McArthur Causeway on Watson Island, which is several hundred yards off downtown Miami’s coast, and end on Dodge Island, a cruise and cargo terminal facility in Biscayne Bay.
Taking about four years to build, the project employed thousands of workers from throughout the greater South Florida area, as well as specialists who operated precision boring equipment that tunneled through the bedrock beneath the water.
Hundreds...

Using easily understood, two-handed controls, workers can easily maneuver the Skyjack 3226 26-foot scissor lift into positon and perform lighting, electrical, painting, plumbing, drywall and other work from on high.
Hand tools include screwdriver, wrenches, hammers, axes – basically, any tool that is powered manually, and is not powered in some manner with electricity or an internal combustion engine.
Recently, one such facility was built on the Fort Meade, MD, U.S. Army base by IHG Army